Decisions:
Summary | Description |
---|---|
Retire Globus GRAM5 satisfaction item | Low satisfaction rating (3.81 in 2016 to 2.74 in 2017, scale 1 - 5) of item may lead to XSEDE no longer supporting this tool. Evaluation team will revisit item retirement when developing 2018 survey in the fall of 2017. |
Action Items:
Summary | Description | Responsible | Due Date |
---|---|---|---|
NSF Review Highlights | Draft 3 high level slides of the User Survey results to be used for the NSF review. Emphasize EPSCoR and MSI satisfaction levels as well as other groups that are particularly satisfied/dissatisfied. Send to John Towns for his review. | Julie Wernert | 5/31/2017 |
Project Impact Metrics | Identify data that can be used to describe XSEDE project-wide impact, particularly from annually collected data. May include the creation of new scales and metrics. Present to the XAB to decide which ones should be instituted. Have this ready for the 8/9/2017 XAB meeting. | Lizanne, Julie, & Lorna | August 2017 |
Trainee satisfaction | Are/could low trainee satisfaction ratings be due to training participation beyond summer events that typically see high satisfaction ratings? Evaluation team will investigate by comparing the satisfaction of summer trainees to fall - spring trainees. | Lorna Rivera | TBD |
Trainee satisfaction | Evaluation team would like to conduct a more in-depth study of trainee satisfaction. Encompass summer trainee study listed above. | Lorna Rivera | TBD |
Notes:
PY6 User Survey Summary Presentation_final_with Notes in comments.ppt