Skip to end of metadata
Go to start of metadata

Decisions:

 SummaryDescription
Retire Globus GRAM5 satisfaction itemLow satisfaction rating (3.81 in 2016 to 2.74 in 2017, scale 1 - 5) of item may lead to XSEDE no longer supporting this tool. Evaluation team will revisit item retirement when developing 2018 survey in the fall of 2017.

Action Items:

SummaryDescriptionResponsibleDue Date
NSF Review HighlightsDraft 3 high level slides of the User Survey results to be used for the NSF review. Emphasize EPSCoR and MSI satisfaction levels as well as other groups that are particularly satisfied/dissatisfied. Send to John Towns for his review.Julie Wernert5/31/2017
Project Impact MetricsIdentify data that can be used to describe XSEDE project-wide impact, particularly from annually collected data. May include the creation of new scales and metrics. Present to the XAB to decide which ones should be instituted. Have this ready for the 8/9/2017 XAB meeting.Lizanne, Julie, & LornaAugust 2017
Trainee satisfactionAre/could low trainee satisfaction ratings be due to training participation beyond summer events that typically see high satisfaction ratings? Evaluation team will investigate by comparing the satisfaction of summer trainees to fall - spring trainees.Lorna RiveraTBD
Trainee satisfactionEvaluation team would like to conduct a more in-depth study of trainee satisfaction. Encompass summer trainee study listed above.Lorna RiveraTBD

Notes:

PY6 User Survey Summary Presentation_final_with Notes in comments.ppt

 

  • No labels